PennDOT Clearfield County Maintenance Work Schedule for the Week of July 15

The Pennsylvania Department of Transportation (PennDOT) announced the following schedule of maintenance activities in Clearfield County the week of July 15. PennDOT performs year-round maintenance in its mission to provide a safe, efficient transportation system, and the scope of work in Clearfield County for the coming week is as follows:

Base Repair:

Base repair is intended to repair fatigue cracked, potholed or distorted pavement sections and restore the structural integrity of the pavement. All distressed material within the area, including the material beneath the asphalt, is removed and replaced with sound material. The new material is then compacted before being overlayed with new asphalt. Base repair extends the service life of good and fair roads and provides a smooth, safe ride for motorists.

Crack Seal & Hot Pour Mastic

Crack sealing and hot pour mastic operations prevent water intrusion from seeping through cracks or joints in an asphalt road, which can lead to potholes and pavement breakup. They are proactive preventive maintenance strategies to prevent water from entering the roadways and accelerating the formation of potholes and other failures.

Manual Patching

Most permanent pothole patching is completed in the spring/summer when temperatures stay consistently above freezing. If maintenance crews were not repairing potholes, the road surface would break up further and require more expensive corrective measures.

Pipe Replacing & Cleaning, Ditching

Pipe replacement and cleaning are essential in maintaining water flow around state roadways. Controlling water flow is one of the most important aspects of maintaining pavements. Uncontrolled water flow will damage both the pavement surface and the area under the pavement, which causes deterioration across the length of the pipe.

Shoulder Maintenance

Shoulder cutting removes excess material and debris from unpaved shoulder areas. Shoulder grading involves the shaping and stabilizing of those same areas. Both operations improve drainage, allow water to leave the roadway, and eliminate shoulder drop-offs. These are crucial highway maintenance operations because when drainage systems do not function properly, water collects on the road, weakens pavement, accelerates the formation of potholes, and creates the potential for icing conditions in the winter months.

Side Dozing

Side dozing removes excess material from beneath guide rail areas, which improves drainage and allows water to sheet flow off the roadway. Side dozing is a crucial highway maintenance operation because when drainage systems do not function properly, water collects on the road, weakens pavement, accelerates the formation of potholes, and creates the potential for icing conditions in the winter months.

Vegetation Management

·         Route 53 between Blue Spruce Road in Bigler Township and Curtin Street in Osceola Mills. Monday, July 15, through Friday, Jul 19. Flaggers in the roadway will provide traffic control during daylight hours.

Mowing, herbicide spraying, and selected tree thinning help maintain a safe roadway free of obstructing vegetation, improving visibility to spot signage, traffic control devices, and other motorists, bicyclists, pedestrians, and animals approaching the road. Additionally, a well-maintained roadside can improve drainage and prolong the life of the roadway.

This schedule is subject to change due to weather conditions, emergencies, or other unforeseen interruptions.

Customers can report road concerns by calling 1-800-FIX-ROAD. If calling after hours, please leave a name and phone number.

For more information on PennDOT’s maintenance activities, visit www.PennDOT.pa.gov/about-us/maintenanceactivities.

Motorists can check conditions on major roadways by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 1,000 traffic cameras. 511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional X alerts.

Subscribe to PennDOT news in Cameron, Centre, Clearfield, Clinton, Elk, Juniata, McKean, Mifflin, and Potter counties at www.penndot.gov/District2.

Information about infrastructure in District 2, including completed work and significant projects, is available at www.penndot.pa.gov/D2Results. Find PennDOT’s planned and active construction projects at www.projects.penndot.gov.

Follow PennDOT on X and like the department on Facebook and Instagram.

Exit mobile version